Integration and Test Photos

Last Updated: Tuesday, 18 June 1998

PANSAT coming out of the shipping container.

Post-ship functional test. Jim (foreground) & Ron (background).

Potting the wire harness with epoxy.

NPS Integration & Test Team. (Jim, Dan, Ron, and David).

(Bigger photo of the team) - 159 k

Pallet Ejection System (PES) used to mate PANSAT to Shuttle Hitchhiker canister.

Preparation of PANSAT onto PES.

Installation of PANSAT onto the PES.

Mass properties testing on spherical air bearing table.

Vibration in the +/- X axis along with the team.

Vibration in the +/- Z axis (our worst case for the printed circuit boards).